Motorists could face delays as major repair work on a Wigan bridge is expected to start in the coming weeks. Structural work had been planned to start in July for the 71-year-old Adam Bridge, on Southgate at the Saddle junction. But that was pushed back and will instead start later this month or early in October, though the actual date has not yet been confirmed. A sign erected on Southgate to warn drivers of the upcoming roadworks has been amended with the new dates. scratch

Read more at: http://www.wigantoday.net/news/environment/delayed-bridge-work-is-due-to-start-in-weeks-1-8738489
tonker
tonker
Posts : 8318
Join date : 2013-12-05
Location : Metropolitan Borough of Haydock

Adam Bridge work Empty Re: Adam Bridge work

Wed Sep 06 2017, 11:29
That's NOT Adam Bridge.

THIS IS Adam Bridge!

(zoom in to read the name on the wall)
Admin
Admin
Admin
Posts : 48105
Join date : 2013-12-04

Adam Bridge work Empty Re: Adam Bridge work

Wed Sep 06 2017, 11:36
Yes I know. Hence the scratchin head

https://www.wigan-rejects.com/t15412-all-our-wigan-yesterdays-adam-viaduct?highlight=adam+bridge

See page two
Sir Bob
Sir Bob
Posts : 8714
Join date : 2013-12-07

Adam Bridge work Empty Re: Adam Bridge work

Wed Sep 06 2017, 11:51
I think the council are going to be working on the bridge over the river dooglas, half of that bridge is about 33 years old and the half on the Asda side is a lot older than that.
Cadfael
Cadfael
Posts : 1743
Join date : 2014-06-20

Adam Bridge work Empty Re: Adam Bridge work

Wed Sep 06 2017, 12:22
They did not do such a good job in 2008 if it needs more work now.
Sir Bob
Sir Bob
Posts : 8714
Join date : 2013-12-07

Adam Bridge work Empty Re: Adam Bridge work

Wed Sep 06 2017, 14:29
If the work was being done on the railway line, the line would have to be closed and Network Rail would be announcing that, but they haven't because they isn't.
Admin
Admin
Admin
Posts : 48105
Join date : 2013-12-04

Adam Bridge work Empty Re: Adam Bridge work

Mon Dec 11 2017, 14:48
Major traffic hold-ups have seen traffic grind to a halt around Wigan's busiest junction today. But council highway bosses say snarl-ups around The Saddle should ease with the end of repairs to Adam Bridge. Today should see the final part of the junction being resurfaced - with engineering work due to be completed by 3.30pm.

Read more at: https://www.wigantoday.net/news/transport/adam-bridge-delays-finally-set-to-end-1-8904152
Corky Ringspot
Corky Ringspot
Posts : 55227
Join date : 2013-12-04
Location : Up a nick in Russia

Adam Bridge work Empty Re: Adam Bridge work

Mon Dec 11 2017, 18:05
Hurrah. Adam Bridge work 709307421

The gateway to Pem. Wigan's answer to the Rive Gauche.
tomplum
tomplum
Admin
Posts : 11879
Join date : 2013-12-05
Age : 71
Location : notreetsville
http://www.tomplum.co.uk

Adam Bridge work Empty Re: Adam Bridge work

Tue Dec 12 2017, 16:12
The work on Adam bridge is still going on today at 11am when I went through,  Work is ongoing on the way out of Wigan and there are still cones diverting traffic away from the left hand side near Screwfix/halfords side,
Vixen
Vixen
Admin
Posts : 6769
Join date : 2013-12-05

Adam Bridge work Empty Re: Adam Bridge work

Tue Dec 12 2017, 16:49
still there at 4.15pm
Sir Bob
Sir Bob
Posts : 8714
Join date : 2013-12-07

Adam Bridge work Empty Re: Adam Bridge work

Tue Dec 12 2017, 17:24
I went through there about 3.00pm and it looks like the works are coming to an end and I would say they will end this week, but not today and then they have to remove all of their equipment and sweep up after themselves Smile